Saturday, July 3, 2010

Cold molding side two

As soon as the weather turned and we started getting temps in the 50's at night ( around June 1) we resumed work on the veneer. To review, we ran out of weather last year to use epoxy so we finished dry-fitting veneer on side one, rolled the boat, and dry fit layer one on side two. After about 6 days of laying veneer with epoxy we completed two layers .

0 comments: